How We Helped Our Client Achieve Over $125,000 in Savings

16 Jan 2024                 By Shane Barker, Pre-Construction Manager

Efficient Engineering Shaves 47% off the Design Cost of our Client's Structure 

Steelcorp Design Plans

Getting the Correct Dimensions


Our client initially worked with an independent engineer who failed to provide accurate measurements for their industrial building.


“The dimensions of the structure were quite far off, and the bays were oversized for the client’s needs,” explains Shane, one of our lead engineers.

By visiting the site in person, Shane measured the structure accurately. As a result:


  • The building’s length was reduced from 30m to 21.5m.
  • Bay widths were adjusted from 10m to 7.16m to suit the client’s specific application.


These adjustments immediately lowered the overall design cost, saving over 2.8m on each bay and 8.5m in building length.

Using Efficient Engineering

While reducing the size of the building was a significant factor, optimising the steel design had an even greater impact. Many in the industry rely on unnecessarily heavy components, driving up costs. Our steel construction services focus on engineering efficiency to minimise material waste without compromising strength.


Shane elaborates:


“The original engineer specified 380PFC steel, which weighs 55kg per metre. Our team revised this to 150 x 100 x 5 RHS steel, reducing the weight to just 18kg per metre.”



This change achieved:


  • A significant reduction in the quantity of steel required.
  • A lighter structure, which reduced transportation and installation costs.
  • A lower carbon footprint due to the reduced material weight.


By using smart engineering principles, we delivered a strong, robust, and cost-effective solution tailored to the client’s needs.

Reach out today to discover how Steelcorp can optimise your next project
Steelcorp Project Management Team

"The original design cost was sitting at $270,000 however our new efficient design cost came out at just $143,000. That’s $127K back in our client’s pocket simply by taking a smart, sustainable approach to designing their structure.”


- Shane Barker

Steel Columns
Talk to us about how our efficient designs can save you time and money

The Result – Massive Savings

Thanks to our efficient design approach, the total cost of the project dropped from $270,000 to $143,000 — a staggering $127,000 in savings.


“That’s $127K back in our client’s pocket simply by taking a smart, sustainable approach to designing their structure,” Shane explains.


This project is a testament to the value of working with an experienced commercial steel supplier that prioritises efficiency and sustainability.


Avoid Cost Blowouts with Steelcorp


Inefficient designs and over-engineering can significantly inflate project costs. At Steelcorp, we specialise in delivering optimised solutions for industrial sheds, warehouses, and other steel structures. Whether you’re planning a new warehouse project or looking for a trusted partner for your steel construction services, we’re here to help.


Contact Us Today


Take the first step towards a cost-effective and sustainable building project. Contact Steelcorp today to discuss your needs and get a tailored solution from leading industrial steel builders.

Steel Members
Share by: